The Forest Lake Stormwater Shield Project was installed in January 2014 for the Brisbane City Council.

24 roof panels and wall sections, 8 columns and the roof beams were pre-manufactured in the HSF workshop.

The pre-fabricated components were transported to site where they were constructed in-situ.

The project posed interesting challenges including access and installation over water in a public space. The Forest Lake site was also on a slope and required a crane to position the pre-manufactured panels in place.

 

Forest Lake pre-work site

Forest Lake pre-work site

Forest Lake pre-fabricated walkway

Forest Lake Site pre-fabricated walkway

Forest Lake Walkway

Forest Lake Walkway installation over water

Forest Lake on-site Fabrication

Forest Lake on-site Fabrication

Forest Lake Crane Lift Installation

Forest Lake Crane Lift Installation

Forest Lake Site Installation

Forest Lake Site Installation

 

 

Leave a Reply